Update on Wayland’s proposed rail trail project

mrctWe met with the Wayland Community Preservation Committee (CPC) on Sept 17th to discuss providing funds to construct the rail trail across the three miles in Wayland. Here is a brief 2 minute summary of what was discussed. Next step is to develop a more detailed estimate of costs. If we stay on the right track (pun intended) the Rail Trail could be built in 2015!

A two minute summary of CPC Meeting is online here (Turn on your volume to hear)

Leave a Reply (full real name required)

Your email address will not be published. Required fields are marked *