Is the end in sight for work at Route 126/27 intersection?

Wayland Town Crier 12/2/11: Is the end in sight for work at Route 126/27 intersection?. It has been two weeks since the last article on the Route 126/27 intersection. So what happened the week of Nov. 14? A lot! The week started with setting the granite curbing, continuing with work on the traffic “loops,” finishing up the catch basins, and other work, all in preparation for the main event, the paving of the road.

Leave a Reply (full real name required)

Your email address will not be published. Required fields are marked *